Just a friendly reminder that these will be our upcoming hours for the holiday season:
Christmas Eve: Closed
Christmas Day: Closed
New Year's Eve: 7:00 am - 12:00 pm
New Year's Day: Closed
Merry Christmas and Happy Holidays from our family to yours!
The same shingles and shakes used to cover roofs may be used as siding; however, different maximum exposures apply (see Figure: Shingle and Shake Maximum Exposures in Weather Exposure). Also, manufacturers package their shingles differently. The number of shingles in a bundle may vary, depending on the mill, so always check the label for the number of bundles required to make one square at the baseline exposure. Refer to Shingle Wall Coverage and Shake Wall Coverage figures, below, to calculate coverage.
Weather Exposure (in.) | Length and Thickness (in.) | ||
---|---|---|---|
16 x 5/2 | 18 x 5/2 1/4 | 24 x 4/2 | |
3 1/2 | 70 | — | — |
4 | 80 | 72 1/2 | — |
4 1/2 | 90 | 81 1/2 | — |
5 | 100 | 90 1/2 | — |
5 1/2 | 110 | 100 | 73 1/2 |
6 | 120 | 109 | 80 |
6 1/2 | 130 | 118 | 86 1/2 |
7 | 140 | 127 | 93 |
7 1/2 | 150 | 136 | 100 |
8 | 160 | 145 1/2 | 106 1/2 |
8 1/2 | 170 | 154 1/2 | 113 |
9 | 180 | 163 1/2 | 120 |
9 1/2 | 190 | 172 1/2 | 126 1/2 |
10 | 200 | 181 1/2 | 133 |
10 1/2 | 210 | 191 | 140 |
11 | 220 | 200 | 146 1/2 |
11 1/2 | 230 | 209 | 153 |
12 | 240 | 218 | 160 |
12 1/2 | — | 227 | 166 1/2 |
13 | — | 236 | 173 |
13 1/2 | — | 245 1/2 | 180 |
14 | — | 254 1/2 | 186 (1/2) |
14 1/2 | — | — | 193 |
15 | — | — | 200 |
15 1/2 | — | — | 206 1/2 |
16 | — | — | 213 |
To calculate quantity of shingles needed:
In addition to field coverage found in tables:
Shake Type, Length, and Thickness (in.) | Weather Exposures (in.) | ||||||
---|---|---|---|---|---|---|---|
7 | 8 1/2 | 10 | 11 1/2 | 14 | 16 | 18 | |
18 x 1/2 Handsplit and Resawn Mediums | 70 | 85 | 100 | 115 | 140 | — | — |
18 x 3/4 Handsplit and Resawn Heavies | 70 | 85 | 100 | 115 | 140 | — | — |
No. 1 18 Taper-Sawn | 70 | 85 | 100 | 115 | 140 | 160 | 180 |
24 x 1/2 Handsplit and Resawn Mediums | 70 | 85 | 100 | 115 | 140 | 160 | 180 |
24 x 3/4 Handsplit and Resawn Heavies | 70 | 85 | 100 | 115 | 140 | 160 | 180 |
No. 1 24 Taper-Sawn | 70 | 85 | 100 | 115 | 140 | 160 | 180 |
24 x 1/2 Taper-Split | 70 | 85 | 100 | 115 | 140 | 160 | 180 |
18 x 3/8 True-Edge Straight-Split | 50 | 60 | 71 | 82 | 100 | — | — |
18 x 3/8 Straight-Split | 82 | 100 | 118 | 135 | 165 | — | — |
24 x 3/8 Straight-Split | 70 | 85 | 100 | 115 | 140 | 160 | 180 |
To calculate quantity of shakes needed:
The underlying course can be either the No. 1 grade product used on the outer course or a lower-grade product.
Starter strip is not recommended for shingle and shake siding. Use a starter course of shingles instead (see Starter Course in Double-Coursing). A lower-quality shingle grade, such as No. 3 Black Label or No. 4 undercoursing, is a suitable starter course for sidewall shingles and shakes. Note: This means that double-course shingle and shake applications start with three courses.
Wood shingles and shakes are made from redwood, western red cedar, northern white cedar, and cypress. Most shingles are sawn smooth on both faces. Shakes are thicker and have at least one split surface, which leaves a rough texture.
Shingle and shake grades for sidewalls are largely the same as those used for roofs. The exception is machine-grooved shakes (also called “rebutted/regrooved shingles”). These are sawn into 16-, 18-, and 24-in. lengths (butts measuring .4 in., .45 in., and .5 in., respectively) with parallel edges, and the face is grooved with striations. Machine-grooved shakes should be double-coursed (see Double-Coursing).
The most practical way to create a drainage plane for shingle and shake siding is with a self-draining rainscreen mat (below).
To create a drainage plane for wood shakes and shingles, install the siding over a drainage mat that will provide a channel to allow water down and out.
If the wall is furred out, horizontal battens will block drainage unless they are installed over opposing vertical battens (spaced 16- to 24-in. o.c.), creating a grid of strapping. Space horizontal battens the length of the shingle, and space vertical battens 16- to 24-in. o.c. With double thickness 1x battens, pack out windows, doors, and corners with 2x material.
Prior to installing strapping or a rainscreen mat, wrap and flash wall sheathing.
Corner boards are commonly used with white cedar shingles, but in traditional style, shingles or shakes are joined to each other at the corners.
Outside corners. With shakes and red-cedar shingles, corners are often woven with two courses on one side alternating with two courses on the other, each hand-planed to the corner profile. This is labor-intensive and requires small, galvanized finish nails to hold the butt joints closed (Inside and Outside Corners, below).
Mitering shakes and shingles is not recommended. These corners are likely to open when the siding shrinks, even if nailed.
Inside corners. Flash inside corners with a right-angle flashing extended at least 3 in. under the shingle courses. At a minimum, they should receive an extra layer of building paper.
The simplest inside corner trim is a 1x1 or 2x2 wood strip installed in the corner with the shingles butted against it (Inside and Outside Corners, below). Inside corners also may be woven in a manner similar to outside corners — two courses on one side, followed by two courses on the other.
A woven corner, typically accomplished with a block plane, is made by alternately lapping a shingle piece on each course. Inside corners may also be woven, but the easiest and cleanest treatment is to butt shingles against a 1- to 2-in.-square post.
Shingles and shakes may be applied in single or double courses. Double-coursing allows for a greater weather exposure (Shingle and Shake Maximum Exposures, below).
Shingle Length | Single Course | Double Course (No. 1) | Double Course (No. 2) |
---|---|---|---|
16" | 7 1/2" | 12" | 10" |
18" | 8 1/2" | 14" | 11" |
24" | 11 1/2" | 16" | not recommended |
Shake Length & Type | Single Course | Double Course (No. 1) |
---|---|---|
16" machine-grooved | 7 1/2" | 12" |
18" machine-grooved | 8 1/2" | 14" |
18" resawn | 8 1/2" | 14" |
24" resawn | 11 1/2" | 18" |
18" taper-sawn | 8 1/2" | 14" |
24" taper-sawn | 11 1/2" | 18" |
24" tapersplit | 11 1/2" | 18" |
18" straight-split | 8 1/2" | 16" |
The maximum weather exposures for shingles and shakes varies, depending on the length and type of material, as well as on the application (single- or double-course).
Double-coursing uses two layers of shingles (or one layer of shakes over a layer of No. 3 or No. 4 shingle). This application allows for wider weather exposures, and creates deep shadow lines at the butt ends (Double-Coursing, below).
Begin with a double underlay course or a single underlay course shimmed out the thickness of a shingle butt with wood lath. Nail undercourse shingles with a single nail in the center.
This approach to laying shakes and shingles features wide weather exposures and deep shadow lines. The outer course drops about 1/2 in. below the undercourse, which typically consists of low-grade shingles.
Double-course applications require face-nailing. Face-nail outer shingles with two nails placed about 2 in. above the butt line and 3/4 inch in from each end. Shingles wider than 8 in. get two more nails driven near the center, about 1 in. apart. The outer course drops about 1/2 in. below the undercourse.
Double-course shingles or shakes may also be used over non-wood sheathing (fiberboard or gypsum). In this case, nail strapping below the butt end of the undercourse with 8d box nails, spaced on-center the distance of the weather exposure.
For visual effect, raising the overcourse about 1 in. provides a double shadow line (Decorative Coursing Variations, below). In this case, the undercourse should be a No. 1 grade shingle.
Over solid sheathing, a double shadow line can be achieved by raising the outer course about 1 in. (near left). Single-course applications can be staggered to create an irregular appearance (far left).
Single-coursing is quicker and less expensive because less material is used for a given wall area. However, it requires a narrow weather exposure (Single-Coursing, below).
Each course is blind-nailed about 1 in. above the butt line, using two nails for shingles up to 8 in. wide and four nails for larger ones. Offset joints in successive courses by at least 1 1/2.
Double the first course using inexpensive, lower-grade shingles (No. 3 Black Label or No. 4 Undercoursing).
Drive nails about 1 in. above the butt line of the course above. For shingles up to 8 in. wide, use two nails per shingle about 3/4 in. from each edge. For wider shingles, drive two more nails about 1 in. apart near the center (Preventing Splits in Wide Shingles, below).
For visual effect, butts can be staggered below (not above) the horizontal line (Decorative Coursing Variations, above). The maximum distance to stagger the butts varies with shingle or shake length: Stagger 1 in. for 16's and 18's or 1 1/2 in. for 24's.
Wide side-wall shingles (over 8 in.) are prone to splitting. To avoid problems, blind-nail as shown above.
Nails
Staples
(For more information refer to the Cedar Shake and Shingle Bureau Wall Manual).
Space all exposed shakes or shingles about 1/8 in. from each other. This allows room for expansion and gives pieces an individual appearance. Tightly packed shingles that get wet before finishing can buckle.
Offset joints in successive courses by at least 1 1/2 in. to avoid leakage between shingles.
To determine the number of courses, divide the height of the wall into equal parts whose length is not greater than the weather exposure for the shake or shingle. Wherever possible, align shingle butt lines with the tops or bottoms of windows or other openings. This may require adjusting a few courses by a fraction of an inch (Even Shingle Layout, below).
To find the number of shingle courses between the top and the bottom of a window: 1) Measure the window height plus the trim. Divide this number by the average shingle exposure. If the resulting number is a fraction, choose the nearest whole number. 2) Hold a tape measure at the corner where the head trim will be, and pull it out to an even multiple. To find the course lines, mark off the even multiples.